Design and construction standards and manuals
On 1 July 2017, Hunter Water implemented a new asset creation process for developer works, which now applies to all Development Assessment requirements letters issued. To find out more, Developers are urged to read the Delivery of Developer Works Manual.
Since the initial launch, Hunter Water has updated and considered feedback from stakeholders. For the latest system documentation and requirements, please use links below:
Standards
- Sewer and Stormwater Crossing Guideline (120KB)
- Policy - Developer Works Entry onto Third Party Property Standard (185KB)
- Standard Drawing - Non Standard Sewer Connection details (518KB)
- Standard - Building Over or Encroaching on Hunter Water Easements or Property (88KB)
- Standard - Community Title Developments Dealing E476715 (205KB)
- Permit To Enter Form (99KB)
- Build over Sewer Policy (224KB)
- Lifesavers pocket book (708KB)
- Standard Auditing of Developer Works (524KB)
- Standard Accreditation of Suppliers for Developer Works (1386KB)
Pressure Sewer Documents
- Hunter Water Pressure Sewer Systems Planning and Design Guideline (465KB)
- Hunter Water Supplement to the Pressure Sewer Code of Australia WSA 07 (694KB)
- Hunter Water Pressure Sewer Systems Hydraulic Design Guideline (707KB)
- Standard Pressure Sewerage Systems Guide for Home Owners and Builders (263KB)